Moving In: Installation
June 29, 2020
Ellen is getting ready for the next phase of installation! So much prep work to get all of the plywood backing cut and ceramic drilled for the heavier sections of the mural. Exciting days ahead!
Moving In: Installation
June 29, 2020
Ellen is getting ready for the next phase of installation! So much prep work to get all of the plywood backing cut and ceramic drilled for the heavier sections of the mural. Exciting days ahead!
90 Whiting Street
Winsted, CT 06098
860-379-3006
Friday, 10am–5pm
Saturday, 10am–5pm
Sunday, 12pm–5pm